Loading...
R-21-42RESOLUTION NO R-21-42 RESOLUTION ENDORSING THE OLD LEE HIGHWAY MULTIMODAL IMPROVEMENTS PROJECT MAJOR DESIGN FEATURES WHEREAS, the City has developed preliminary engineering plans for multimodal improvements on Old Lee Highway between Layton Hall Drive and Ridge Avenue; and WHEREAS, these plans were developed based on recommendations from the 2014 Metropolitan Washington Council of Governments Transportation/Land Use Connection (TLC) Program Visioning Study; and WHEREAS, the City has been developing the 30% engineering plans since 2016; and WHEREAS, the city has requested feedback on the plans between 2016 and now via a stakeholder committee, an open house, and the project website; and WHEREAS, features of the plans have been modified a number of times based on input received; and WHEREAS, the Major Design Features of the plan have now been identified and include the following: • Typical Section consisting of a sidewalk and 2-way separated bike facility on the west side of the roadway, a sidewalk along the east side of the roadway, and one vehicular travel lane in each direction • Existing right and left turn lanes to remain (except Great Oaks) • New turn lanes from NB to Sherwood, SB to Daniels Run Elementary School, NB to Old Post Road, and NB to Great Oaks Drive • Roundabout at Ridge Avenue; and WHEREAS, the City is ready to advance the plans through final engineering and will continue to evaluate other issues identified through the public process including private entrance connections, landscaping and bus stops; and NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Fairfax, Virginia that the City Council approves the Major Design Features of the Old Lee Highway Multimodal Improvements Project. Adopted: November 9, 2021 Mayor Attest: 1-1-101 W.-.9A 11 0, J ww'. ". bty Clerk The vote on the motion to approve was recorded as follows: VOTE: Councilmember Harmon Naye Councilmember Lim Aye Councilmember Miller Aye Councilmember Ross Aye Councilmember Stehle Aye Councilmember Yi Naye