Loading...
R-11-36 RESOLUTION NO. R -11 -36 APPROVAL OF THE TRANSFER OF FUNDS FOR THE CHAIN BRIDGE ROAD (ROUTE 123) BRIDGE REPLACEMENT OVER THE ACCOTINK CREEK PROJECT WHEREAS, at the June 14, 2011 City Council meeting, the City Council was presented with revised design concepts for the Chain Bridge Road Bridge Replacement over the Accotink Creek Project and the City Council directed staff to proceed with the project with the revised design concepts per comments received during the public outreach meetings, and comments received from the public and the City Council at the May 24, 2011 public hearing; WHEREAS, due to the revised concepts, additional costs are needed for the engineering, design, construction, and construction management of the narrower bridge and the pedestrian bridge; WHEREAS, now that the new design concepts have been approved, a more accurate cost estimate of the project can be made; NOW, THERFORE BE IT RESOLVED that the City Council of the City of Fairfax, Virginia, hereby approves the transfer of a total of $2.2 million to the Chain Bridge Road Bridge Replacement over the Accotink Creek Project, and $605,026 should come from excess funds from the George Mason Boulevard project UPC #76995 and $1.6 million should come from the Urban funds previously allocated to the Northfax Storm Drainage and Intersection Improvements project UPC #16632. ADOPTED this 12 day of July, 2011. �__ 1'� • - r Mayor R 2 i/ Dat ATTEST: 14(14,1,.■iL iii City Clerk The vote on the motion to approve was recorded as follows: VOTE: Councilman Drummond Aye Councilman Greenfield Aye Councilman Meyer Absent Councilmember Schmidt Aye Councilman Silverthorne Aye Councilman Stombres Aye